Glenn, the excavator, continues to make quick progress on the site. All the stumps are piled in the way-back, all the cedars are chipped into a mulch pile behind the future garage site, and all the hardwood is cut for splitting into firewood. (Mike chain-sawed that last night)
Today the driveway was located and formed, a drainpipe installed under its apron, and landscaping fabric laid along its length. A small front-end loader beeped around the site, no doubt annoying the neighbors. Dump truck loads of crushed shale were delivered to spread and compact for the driveway base.
No comments:
Post a Comment