Excavation & Soil Compaction |
Foundation Form-work & Reinforcing |
Floating the Concrete Slab |
Back-fill Around Slab |
Sill Plates onto Anchor Bolts |
Framing of First Walls |
All walls with door and window openings are framed |
Setting Roof Trusses & Applying Wall Sheathing |
Wall and Roof Sheathing |
Building Paper and Windows |
Fascia, Drip Edge & Roof Shingles |
Door, Casing & Soffits |
Exterior Trim - look close: white on white |
Over-head Doors and Clapboard Siding |
Shingles Applied in Gables |
Completed Exterior Siding |
I thought it would be interesting to see this small building from beginning to end all in one post. Click HERE to read my "architect on a soap box" post about garages and house design. The last things that still need to happen to this garage building is the electrician will wire the garage (and a cool barn light will be hung above the over-head doors) and the excavator will place top soil and driveway material. Next year, when the grass is green all around the building, I'll add a truly "final" photo.
No comments:
Post a Comment