Demolition and repair work has been going on at the The Family House on the Lake.
Footings have been poured for the west bedroom addition, as well as the east Pantry upgrade. Forms are set for pouring concrete foundation walls. Electrician is coordinating with the power company to relocate electric panel/weather-head where lines come in. And plumber is coordinating pipes from well. Alot is happening! Here are some photos:
|
Forms for foundation walls for bedroom addition (right) |
|
On left, foundation walls for Pantry Room, which was only on piers before |
|
Old Stone Foundation meets new poured concrete foundation |
|
Second Floor ceiling stripped and ready for next steps |
|
Dusk at the Lake House |