Tuesday, February 20, 2018

Blue House update

First Floor Kitchen space is opened up to Office with beam in ceiling
New Master Bedroom with vaulted ceiling and sunset windows
Work has been progressing at the Blue House next to the School. The windows were installed, as well as rough electrical and plumbing. Then insulation was placed in the cavities of roofs and walls. (Remember all walls also have continuous insulation integral with the sheathing, which is great for better air sealing and reducing thermal bridges.) Exterior trim was installed around windows. Interior sheet rocking of walls and ceilings happened. With that surface applied, one can really see what the rooms will feel like! Next is shingle siding, flooring, painting, finish electric/plumbing, and interior cabinetry! (and the new screened porch those french doors will lead to!)

Back elevation
Site of the future second floor laundry and Master Batrh


Sheet rock on wall in Dressing Room / Walk in Closet/ Master Bathroom

Kitchen! Ready for cabinetry and flooring

Sunny Master Bedroom


No comments:

Post a Comment