Metal Roofing, Fascias, and Drip Edge being installed |
Work continues at the New House After a Fire. Roof installation is underway along with the white fascia boards and drip edge all around the edge of the roof plane. (see the coils of metal?) The back deck - which is expansively large and accessed by 3 doors in 3 rooms - has been built, along with its railing and stair. The balconies have their decking, but don't yet have their railing. Check out the fantastic mountain view and you can see why we have these outdoor spaces.
Deck with mountain view |
Balcony off back bedrooms toward view |
Inside, the plumbers and electricians have been busy installing wiring, supply and drain pipes, and duct work for heating and cooling. Not pretty stuff, but we can all agree, super valuable! Some photos of their work before it all gets covered up by wall board:
Supply and Return Air Ducts and Boxes/Wiring |
Bathroom Water Piping: Red/hot & Blue/cold Supply and White Drains |
Air Sealing (Orange Spray Foam) around all holes |
Framing for Fireplace & Hearth with Blocking for TV above |
No comments:
Post a Comment