Monday, April 21, 2014

Tile Day 1

 Today a new sub-contractor arrived on site: The Tile Guy!
He installed the tile on the floor in the back entry area and in the first floor bathroom. In addition, he put down the "mud" in the shower area of the second floor bathroom. Remember, that the shower is "curb-less", meaning there is no lip to step over to get in. (see post on Universal Design) Because of this design feature, the shower floor was framed low, and then had to be raised up to be level with the rest of the bathroom floor with mud. The mud creates a bed that is sloped toward the drain and will get tile installed on it tomorrow.
Tile Floor at First Floor Bathroom

Tile at Back Entry/Mud Room

No comments:

Post a Comment