Work at the NHND is moving slowly now, getting the final fixtures installed and such.
But! Here on our property, we have started a new outbuilding project that's in the early framing stages and is moving fast. This building will be a two-vehicle car port and a one room wood working shop/studio space.
(click here to go to first post about this project)
The foundation and site work is very low-impact by design. Piers reach below grade to frost and support a wood floor system. 2x4 walls support a scissor truss (higher in the middle) roof. The truss is also designed to perform well in terms of energy code, by having a "raised heel" to have more space for insulation above the wall (that spot is traditionally a weak link in the insulation/thermal barrier). The walls will be sheathed with continuous insulation, as well as insulated within the wall cavity. This 23'x23' space will be high, and dry, well lit and warm - all things DH's current workshop in the basement is not. Yay!
In terms of zoning and site planning design, this building was designed to meet the Village's codes and pattern book. Since the one end of the structure is for cars - although not a technically a garage, I located it back 20' from the front of the house, to keep it secondary - as an outbuilding should be. The workshop part will have a front porch facing the street, and our driveway became a circular shape, with two entrances/exits. There are always restrictions regarding how much of the site can be covered by building footprint, and we were careful to meet all requirements and presented our site plan to the planning board for approval last year.
|
Concrete pier foundation with wire, fabric & gravel under building |
|
Wood framed floor system for workshop/studio space |
|
Raising the last wall of workshop |
|
Roof trusses |