Friday, July 29, 2016

Framing at the New House Next to the Pond

Here is an update on The New House Next to the Pond.

The last post (click HERE to read) showed the site work and the footings - photos of dirt and concrete without too much to help you envision the beautiful house that will be there... But now we have insulated foundation walls and the first floor system and first floor walls framed.
View from Southwest / Driveway approach
In the photo above you can see the walk-out basement room on the left that looks toward the pond. Dirt and a retaining wall will bring the grade higher than it looks now, so that the front porch will only be 3 steps up. You can see the cardboard sonotubes sticking up at the front/south and on the west. These will be filled with concrete to provide a footing for the front porch and screen/sun porch roofs.
On the right side you can see the cantilever bump-out that is part of the eating area, and then the master bedroom wing in the background. In general, you can start to see where windows or doors will be located.

Peeking into the basement through the walk-out door
 Some plumbing has been roughed in under the basement slab so that a future bathroom can be built on the lowest level. (white pipes sticking up on the right). The opening in the floor shows where the stair will connecting the levels.

North Side Elevation
 This is the back of the house. On the left is the master bedroom wing, which also is where the garage will connect into the mud room. On the right is the high spaces for the office and living room with the stair in between.

South Elevation (front)
Footing forms await concrete delivery for garage
The 24' x 36' garage is tucked behind the house. They will start building that next and then build a connection between the roofs for a dry walk from house to car.

Coming up: Second Floor framing and Roof!