Passing up the 2x10s for the second floor joists
Early this past week beams and second floor joists were being installed at the NHND to the Pond. The end of that week the roof rafters and trusses started going on. Here are some photos showing all the sticks of wood that hold up this house.

Floor Joists (on left) make first floor Office ceiling and second floor - Beam to hold floor/roof load above (on right)
 
Large Pressure Treated Beams set in place to support floor, roof & walls of Screen/Sun Porch
Roof & Dormer Framing and Second Floor Walls are Framed

Roof over Master Bedroom wing is a scissor truss for vaulted ceilings

Standing in MBr and looking out future window seat windo