Thursday, August 18, 2016

NHND to the Pond Framing Update

Front of the House - Screen Porch on left/west, Gable Roof for Front Porch 
Lots has been happening at the New House Next Door to the Pond. The foundation for the garage is poured. The garage walls and roofs are framed. Forms are in place for pouring a large retaining wall. The front porch roof rafters and screen/sun porch roof rafters are in place. Some of the wall sheathing (which is insulated sheathing, offering continuous insulation - see former post HERE to read about CI) is being installed, as well as the roof sheathing to help keep it dry inside through all these summer thundershowers. (wall sheathing is green, roof sheathing is red) These solid surfaces help you see the shapes of the building more clearly in the photos while also starting to show the dormer design, window seat bump-outs in eating area and master bedroom, and window placement and size. You can see/feel how the light and views will be connected between inside and out as well as some of the intricacies of the massing. (exciting stuff!)


Back of the House - Dormer pops up in roof for stairway

Bump-out Window Seat in Master Bedroom Wing- Long Southern Dormer for Second Floor Bedrooms
Garage Wall poured and interior tamped down and ready for slab pour

Garage Walls & Roof Framed

Screen/Sun Porch- Looking toward Pond and Sunset Views

Stair Landing Window Frames Wooded View